S. N. |
DAYS |
FIELD OPERATIONS |
1 |
6 days before transplanting |
Spraying of glyphosate@1kg a.i./ha |
2 |
1-2 days before transplanting |
Dry tillage using single pass wih power tiller /rotavator with 150 kg N-P-K(10-26-26)/ha followed by irrigation and laddering |
3 |
On the day of transplanting |
Transplanting with Rice Transplanter* using 18-20 days old seedlings from mat nursery |
4 |
1-2 days after transplanting |
Spraying of Pendimethalin @1kg ai/ha / Pretilachor @0.5 kg ai/ha |
5 |
20-22 days after transplanting |
Bispyrabic-Na @25g ai/ha +Pyrazosulfuron @20g ai/ha OR Fenaxoprop@ 90ml ai/ha +Ethoxysulfuron @18g ai/ha OR Weeding with paddy weeder |
6 |
25-26 days after transplanting |
First Top Dressing (Urea 90 kg/ha) |
7 |
30 days after transplanting |
Spraying of Chellated Zn (1 g/liter water) |
8 |
35-40 days after transplanting |
Bispyrabic-Na @25g ai/ha +Pyrazosulfuron @20g ai/ha OR Fenaxoprop@ 90ml ai/ha +Ethoxysulfuron @18g ai/ha OR Weeding with paddy weeder |
9 |
45 days after transplanting |
Second Top dressing ( Urea 60 kg + MOP 37.5 kg/ha) |
10 |
50-55 days after transplanting |
Spraying of Chellated Zn (1 g/liter water) |